Since 1975
Al Faisaliyah Engineering LLC is a leading EPC contractor offering in-house services for major construction disciplines in onshore and offshore areas. READ MORE
Engineering, Procurement and Construction Work related to Hbshan Plant Control System Upgrades
VIEW ALLDetailed Engineering, Procurement, Construction, pre-commissioning and commissioning of installation of ethane cracker unit
VIEW ALLConstruction of 12 industrial buildings and associated CMEI works.
VIEW ALL1.CMEI Works at DC1, DC4, DC6 & HLE Islands
VIEW ALL'Intake System, Outfall System, Onshore Platform, Supply and installation of aids to navigation, Supply and installation of oil boom
VIEW ALLThe extension of existing plant with installation of various static & rotating Equipment and flowlines
VIEW ALL
Carry out the general construction works for ADNOC Onshore’s Bu-Hasa Integrated Field Development Project
Read more
Construction of two residential apartment towers with total built up area of 154,683 sqm. Tower 1 has 52 floors and Tower 2 has 46 floors.
Read more
Piping fabrication & Installation, Plant equipment erection and steel structure erection works
Read more
Replacement of the existing vintage HV draw out, 4.16kV Motor Control Gear equipment from the assigned substations at UGP & SGP
Read more
Engineering, design, procurement, supply, install, construction, mechanical completion, testing and commissioning for the sea water system
Read more
14 nos. of Residential Buildings serving as Bachelors Accommodation
Read moreA Symbol of Strength and Advancement in Marine Capabilities
Projects Completed
Strong Workforce
marine vessels
ASME / API certified facility
For the company, Quality, Health, Safety & Environment (QHSE) and delivery - are PRIORITIES. The company's operations are governed by established policies and procedures which are aimed at systemizing and streamlining processes which form the basis for continual improvement. Al Faisaliyah Engineering LLC implements an Integrated Management System (IMS) which has been certified by DNV to the following standards: